Axiom Group has considerable experience planning and installing commercial flooring solutions for the UK’s busiest airports including:
Heathrow
Heathrow Terminal T2A
£3m flooring package working both Public and Airside installing new floor coverings to the terminal
New Flooring to Control Post 8 – £35K
British Airways Operational Base – replacement of floor coverings – £45K
British Airways Waterside Theatre – replacement of floor coverings – £24K
British Airways, Waterside, Europe House, Network Op’s Delivery Centre – replacement of floor coverings – £58K
New AOF Snow Base Facility Heathrow – £116K
New T2A MSCP (Car Park) – new floor coverings to core areas – £124K
Gatwick
London Gatwick North & South Terminal – CSC Phase 2 – £50K
Gatwick South Terminal Pier 1 – £260K
Manchester Airport
£800,000 flooring scheme for Manchester Airport removing existing floor coverings, applying new screeds and installing Nora rubber floor coverings
East Midlands Airport
£250,000 contract to remove existing floor coverings and lay new floors to Departures Gates
Farnborough
Tag Aviation Farnborough Ground Support Facility – £110K
Stanstead Airport
Enterprise House Corridors, Stansted Airport – £55K
Stansted Enterprise House Stair Works – £25K